|
 |
It all begins
right here in our factory. |
|
The materials
are lined up... |
 |
 |
And the laser
welder is warmed up. |
|
The Material
Is brought the assembly table |
 |
|
 |
and laid out. |
|
Where it is
inspected for quality... |
 |
 |
And pinhole
leaks. |
|
The material
Is cut and welded in the proper lengths |
 |
|
 |
And gathered
to finally assembly. |
|
The liners are
done and ready for packaging |
 |
|
 |
The galvanized
steel piping is manufactured |
|
And cut and
fabricated as needed |
 |
|
 |
Then it awaits
its final step. |
|
Powder coating
is applied and then the steel is baked to seal the
finish |
 |
|
 |
The Pools are
Test Assembled |
|
And tested in
every environment |
 |
|
 |
The pool parts
are assembled and.. |
|
then they are
ready to be |